Rwanda RAMS - Task #57: [TMS] Reports > Traffic Pro... Task #57: [TMS] Reports > Traffic Projection

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 02/04/2024
Due date:
Assignee: Kalyan Battula
Priority: High
Rwanda RAMS - Task #54: [TMS]Reports > ADT by Station Task #54: [TMS]Reports > ADT by Station

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 02/04/2024
Due date:
Assignee: Kalyan Battula
Priority: High
Rwanda RAMS - Task #53: [TMS] Reports > ADT Hourly ... Task #53: [TMS] Reports > ADT Hourly Variation

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 02/04/2024
Due date:
Assignee: Ravi Shekar Gotimukul
Priority: High
Rwanda RAMS - Task #52: [TMS] Reports > ADT Distrib... Task #52: [TMS] Reports > ADT Distribution by Mode

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 02/04/2024
Due date:
Assignee: Ravi Shekar Gotimukul
Priority: Normal
Rwanda RAMS - Task #51: [TMS] Reports > Daily ADT D... Task #51: [TMS] Reports > Daily ADT Distribution

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 02/04/2024
Due date:
Assignee: Ravi Shekar Gotimukul
Priority: High
Rwanda RAMS - Task #50: [TMS] Reports > Average Dai... Task #50: [TMS] Reports > Average Daily Traffic (ADT)

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 02/04/2024
Due date:
Assignee: Ravi Shekar Gotimukul
Priority: High
Rwanda RAMS - Task #49: [TMS] Reports > Daily Traff... Task #49: [TMS] Reports > Daily Traffic Count

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 02/04/2024
Due date:
Assignee: Ravi Shekar Gotimukul
Priority: High
Rwanda RAMS - Task #48: [TMS] Reports > Daily Count... Task #48: [TMS] Reports > Daily Count Direcition-wise

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 02/04/2024
Due date:
Assignee: Ravi Shekar Gotimukul
Priority: High
Rwanda RAMS - Task #46: [TMS] Reports development Task #46: [TMS] Reports development

Project: Rwanda RAMS
Status: New
Start date: 02/04/2024
Due date:
Assignee: Harinath Vajrala
Priority: High

3

4

5

Rwanda RAMS - Task #59: RTDA Dev test cases status Task #59: RTDA Dev test cases status

Project: Rwanda RAMS
Status: In Progress
Start date: 05/04/2024
Due date:
Assignee: Rajshekar Gotimukul
Priority: High

6

15

7

8

9

10

11

12

13

16

14

15

Rwanda RAMS - Bug #60: [TMS] Lookup->Growth-rate Bug #60: [TMS] Lookup->Growth-rate

Project: Rwanda RAMS
Status: Resolved
Start date: 15/04/2024
Due date:
Assignee: Kalyan Battula
Priority: High

16

Rwanda RAMS - Bug #61: RTDA build issues 15 April... Bug #61: RTDA build issues 15 April 2024

Project: Rwanda RAMS
Status: Resolved
Start date: 16/04/2024
Due date:
Assignee: Kalyan Battula
Priority: Normal

17

Rwanda RAMS - Feature #97: Notification for new roads ... Feature #97: Notification for new roads added

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 17/04/2024
Due date:
Assignee: Praveen kumar Bandi
Priority: Normal
E-Arogya - Bug #67: [Security Audit ] 2-Insecur... Bug #67: [Security Audit ] 2-Insecure Data Storage

Project: E-Arogya
Status: In Progress
Start date: 17/04/2024
Due date:
Assignee: Srinivas Kanukolanu
Priority: High
E-Arogya - Feature #65: Security Audit Feature #65: Security Audit

Project: E-Arogya
Status: New
Start date: 17/04/2024
Due date:
Assignee:
Priority: High

18

19

HIMS_RRAMS Web - Task #102: RRAMS User Manuals Document... Task #102: RRAMS User Manuals Documentation

Project: HIMS_RRAMS Web
Status: New
Start date: 19/04/2024
Due date:
Assignee: Bhargav Turaga
Priority: Low
Rwanda RAMS - Feature #101: Manual Documentation for th... Feature #101: Manual Documentation for the Rwanda RAMS

Project: Rwanda RAMS
Status: In Progress
Start date: 19/04/2024
Due date:
Assignee: Bhargav Turaga
Priority: High

20

17

21

22

23

RRAMS PWD - Mobile Application - Feature #104: SSL Implementation Feature #104: SSL Implementation

Project: RRAMS PWD - Mobile Application
Status: In Progress
Start date: 23/04/2024
Due date:
Assignee: Jyoshna Behara
Priority: High

24

E-Arogya - E-Arogya - Sprint 1 (29th April - 3rd May)

25

E-Arogya - Feature #111: [LAB] Dashboard Page UX design Feature #111: [LAB] Dashboard Page UX design

Project: E-Arogya
Status: New
Start date: 25/04/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #110: [LAB] Laboratory OP Module Feature #110: [LAB] Laboratory OP Module

Project: E-Arogya
Status: New
Start date: 25/04/2024
Due date: 29/07/2024
Assignee: Srusvin Loka
Priority: Normal

26

Rwanda RAMS - Bug #138: RLRS - Manage data Bug #138: RLRS - Manage data

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 26/04/2024
Due date:
Assignee: Praveen kumar Bandi
Priority: High
Rwanda RAMS - Feature #133: [Service] - Show Road name ... Feature #133: [Service] - Show Road name and link name unique in application level.

Project: Rwanda RAMS
Status: Resolved
Start date: 26/04/2024
Due date:
Assignee: Kalyan Battula
Priority: High
Rwanda RAMS - Feature #130: [Service] - Import for Util... Feature #130: [Service] - Import for Utility table

Project: Rwanda RAMS
Status: Resolved
Start date: 26/04/2024
Due date:
Assignee: Kalyan Battula
Priority: High
Rwanda RAMS - Feature #129: [Service] - Import for Prop... Feature #129: [Service] - Import for Property Details table

Project: Rwanda RAMS
Status: Resolved
Start date: 26/04/2024
Due date:
Assignee: Kalyan Battula
Priority: High
HIMS ERP 1.0 - Feature #128: [Service] - Suervey Year /... Feature #128: [Service] - Suervey Year / Current Year - We need to show the label based on the condition - Dropdown label

Project: HIMS ERP 1.0
Status: New
Start date: 26/04/2024
Due date:
Assignee: Praveen kumar Bandi
Priority: Normal
HIMS ERP 1.0 - Feature #127: [Service] - Remove Linkcod... Feature #127: [Service] - Remove Linkcode from Dashboard filter

Project: HIMS ERP 1.0
Status: New
Start date: 26/04/2024
Due date:
Assignee: Praveen kumar Bandi
Priority: Normal
HIMS ERP 1.0 - Feature #126: [Service] - Analysis for m... Feature #126: [Service] - Analysis for multiple language saving in Resource files

Project: HIMS ERP 1.0
Status: New
Start date: 26/04/2024
Due date:
Assignee: Praveen kumar Bandi
Priority: Normal
HIMS ERP 1.0 - Feature #125: [Service] - Themes User wise Feature #125: [Service] - Themes User wise

Project: HIMS ERP 1.0
Status: New
Start date: 26/04/2024
Due date:
Assignee: Praveen kumar Bandi
Priority: Normal
HIMS ERP 1.0 - Feature #124: [Service] - Dynamic Logo s... Feature #124: [Service] - Dynamic Logo saving .

Project: HIMS ERP 1.0
Status: New
Start date: 26/04/2024
Due date:
Assignee: Praveen kumar Bandi
Priority: Normal
HIMS ERP 1.0 - Feature #122: [UI] Create global Applicat... Feature #122: [UI] Create global Application Theme

Project: HIMS ERP 1.0
Status: Resolved
Start date: 26/04/2024
Due date:
Assignee: Surender Billa
Priority: Normal
HIMS ERP 1.0 - Feature #118: [UI] Global styles setup wi... Feature #118: [UI] Global styles setup with variables

Project: HIMS ERP 1.0
Status: Resolved
Start date: 26/04/2024
Due date:
Assignee: Surender Billa
Priority: Normal
HIMS ERP 1.0 - Feature #117: [UI] Create unique product ... Feature #117: [UI] Create unique product Icons set

Project: HIMS ERP 1.0
Status: In Progress
Start date: 26/04/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
HIMS ERP 1.0 - Feature #116: [UI] Application Loader ico... Feature #116: [UI] Application Loader icon design

Project: HIMS ERP 1.0
Status: In Progress
Start date: 26/04/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
HIMS ERP 1.0 - Feature #113: [UI] Creating UI Layout Arc... Feature #113: [UI] Creating UI Layout Architecture

Project: HIMS ERP 1.0
Status: Resolved
Start date: 26/04/2024
Due date: 20/06/2024
Assignee: Ramesh Billa
Priority: Normal
HIMS ERP 1.0 - HIMS ERP 1.0 - Sprint 1 (29th April - 3rd May)

27

18

28

HIMS_RRAMS Web - Bug #152: Cascase updates not happeni... Bug #152: Cascase updates not happening for referenced tables with Side column in it.

Project: HIMS_RRAMS Web
Status: New
Start date: 28/04/2024
Due date:
Assignee:
Priority: Normal
HIMS_RRAMS Web - Bug #151: RRAMS/ HIMS GIS page is not... Bug #151: RRAMS/ HIMS GIS page is not filtering data after the latest build deployed in Production

Project: HIMS_RRAMS Web
Status: New
Start date: 28/04/2024
Due date:
Assignee: Bhanuchander Sannidhanam
Priority: High
Rwanda RAMS - Feature #141: [Service] - CRUD operations... Feature #141: [Service] - CRUD operations and Import to TextureDepth Table.

Project: Rwanda RAMS
Status: Resolved
Start date: 28/04/2024
Due date:
Assignee: Sairam Lingala
Priority: High
Rwanda RAMS - Bug #140: Verify the data is showing ... Bug #140: Verify the data is showing based on the IsRLRS condition in RLRS,URMS and PMS module pages.

Project: Rwanda RAMS
Status: Feedback
Start date: 28/04/2024
Due date:
Assignee: Jagadish Vangara
Priority: High
Rwanda RAMS - Feature #139: [UI] - [RRMS] - CRUD Operat... Feature #139: [UI] - [RRMS] - CRUD Operations to UtilityPostion, Spaceoccupied tables RRMS.tlUtilityPosition RRMS.tlSpaceOccupied

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 28/04/2024
Due date:
Assignee: Narayana Akkipalli
Priority: Normal

29

Rwanda RAMS - Bug #352: RLRS module missed mandato... Bug #352: RLRS module missed mandatory fileds added

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 29/04/2024
Due date:
Assignee: Vengaiah Patcha
Priority: Normal
HIMS ERP 1.0 - Bug #169: [UI] Theming on Buttons, R... Bug #169: [UI] Theming on Buttons, Radio, Tables, Input controls, tabs, Select Controls like web kit

Project: HIMS ERP 1.0
Status: Resolved
Start date: 29/04/2024
Due date: 03/05/2024
Assignee: Praveen Madeti
Priority: Normal
Rwanda RAMS - Bug #168: List of issues in RLRS,URMS... Bug #168: List of issues in RLRS,URMS Network Management,Look ups

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 29/04/2024
Due date:
Assignee: Narayana Akkipalli
Priority: Normal
E-Arogya - Feature #167: [User Mgmt] Create service ... Feature #167: [User Mgmt] Create service to block and unblock the HIMS user.

Project: E-Arogya
Status: New
Start date: 29/04/2024
Due date:
Assignee: Panchajanya mukkamala
Priority: Normal
E-Arogya - Feature #165: [User Mgmt] Create Service ... Feature #165: [User Mgmt] Create Service to load all features and functions of a login role.

Project: E-Arogya
Status: New
Start date: 29/04/2024
Due date:
Assignee: Panchajanya mukkamala
Priority: Normal
E-Arogya - Feature #159: [User Mgmt] Create services... Feature #159: [User Mgmt] Create services for Role Master screen.

Project: E-Arogya
Status: Resolved
Start date: 29/04/2024
Due date:
Assignee: Vasu Malladi
Priority: Normal
Karnataka Project Info Management System - Bug #153: [UI] KPIMS UI Alignment Issues Bug #153: [UI] KPIMS UI Alignment Issues

Project: Karnataka Project Info Management System
Status: New
Start date: 29/04/2024
Due date:
Assignee: Surender Billa
Priority: High
E-Arogya - Feature #150: [User Mgmt] Add Module feat... Feature #150: [User Mgmt] Add Module features and feature functions in Database

Project: E-Arogya
Status: Resolved
Start date: 29/04/2024
Due date:
Assignee: Vasudev Mamidi
Priority: Normal
E-Arogya - Feature #149: [User Mgmt] Develop service... Feature #149: [User Mgmt] Develop services for Employee master feature.

Project: E-Arogya
Status: Resolved
Start date: 29/04/2024
Due date:
Assignee: Vasudev Mamidi
Priority: Normal
E-Arogya - Feature #144: [User Mgmt] Create a module... Feature #144: [User Mgmt] Create a module for user Management.

Project: E-Arogya
Status: New
Start date: 29/04/2024
Due date: 02/05/2024
Assignee: Harish Beechani
Priority: Normal
E-Arogya - Feature #143: Source Code Merging Feature #143: Source Code Merging

Project: E-Arogya
Status: Resolved
Start date: 29/04/2024
Due date:
Assignee: Harish Beechani
Priority: Normal
RRAMS Citizens - Mobile Application - Bug #142: Code optimization Bug #142: Code optimization

Project: RRAMS Citizens - Mobile Application
Status: Resolved
Start date: 29/04/2024
Due date: 02/05/2024
Assignee: Prashanth Appani
Priority: Immediate
HIMS ERP 1.0 - Feature #123: [Service] - R&D for upgradi... Feature #123: [Service] - R&D for upgrading from .Net Framework 4.8 to .Net 8.0.

Project: HIMS ERP 1.0
Status: Resolved
Start date: 29/04/2024
Due date:
Assignee: Praveen kumar Bandi
Priority: Normal
HIMS ERP 1.0 - Feature #121: Check latest versions for B... Feature #121: Check latest versions for Bootstrap, Angular Material , and mat icons to implement in Application

Project: HIMS ERP 1.0
Status: Resolved
Start date: 29/04/2024
Due date:
Assignee: Praveen Madeti
Priority: Normal
HIMS ERP 1.0 - Feature #120: [UI] Generate custom css i... Feature #120: [UI] Generate custom css icons library

Project: HIMS ERP 1.0
Status: Resolved
Start date: 29/04/2024
Due date: 20/06/2024
Assignee: Surender Billa
Priority: Normal
HIMS ERP 1.0 - Feature #119: [UI] Error, warning, succes... Feature #119: [UI] Error, warning, success message format

Project: HIMS ERP 1.0
Status: In Progress
Start date: 29/04/2024
Due date:
Assignee: Surender Billa
Priority: Normal
HIMS ERP 1.0 - Feature #115: [UI] Box /Content Title, Mo... Feature #115: [UI] Box /Content Title, Modal header, Modals

Project: HIMS ERP 1.0
Status: In Progress
Start date: 29/04/2024
Due date:
Assignee: Praveen Madeti
Priority: Normal

30

RRAMS Citizens - Mobile Application - Bug #187: DioError handle in project Bug #187: DioError handle in project

Project: RRAMS Citizens - Mobile Application
Status: Resolved
Start date: 30/04/2024
Due date: 30/04/2024
Assignee: Prashanth Appani
Priority: Immediate
E-Arogya - Feature #222: [LAB] Create UX design for ... Feature #222: [LAB] Create UX design for Lab Parameter Master

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
E-Arogya - Feature #219: [LAB] Create UX design Resu... Feature #219: [LAB] Create UX design Result Template Master

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
E-Arogya - Feature #216: [LAB] Create UX design for ... Feature #216: [LAB] Create UX design for Bulk result verify feature

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
E-Arogya - Feature #213: [LAB] Create UX design for ... Feature #213: [LAB] Create UX design for Culture & Sensitivity test result entry screen

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
Rwanda RAMS - Bug #211: RLRS module bug fixes Bug #211: RLRS module bug fixes

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 30/04/2024
Due date:
Assignee: Narayana Akkipalli
Priority: Normal
E-Arogya - Feature #210: [LAB] Create UI screen for ... Feature #210: [LAB] Create UI screen for result entry feature

Project: E-Arogya
Status: Resolved
Start date: 30/04/2024
Due date:
Assignee: Uma Maheswarachari Melpati
Priority: Normal
E-Arogya - Bug #209: Autorization Roles - Create... Bug #209: Autorization Roles - Create UserGroups

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee:
Priority: Normal
E-Arogya - Feature #208: [LAB] Create UX design for ... Feature #208: [LAB] Create UX design for result entry screen

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
E-Arogya - Bug #207: Autorization Roles - Start ... Bug #207: Autorization Roles - Start using spring security authorization in repo and services classes

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Harish Beechani
Priority: Normal
E-Arogya - Feature #206: [LAB] Create services for u... Feature #206: [LAB] Create services for updating Sample Received status in Lab department.

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
E-Arogya - Feature #205: [LAB] Create UI design for ... Feature #205: [LAB] Create UI design for Sample Received status update in Lab department.

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
E-Arogya - Bug #204: Autorization Roles Bug #204: Autorization Roles

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Panchajanya mukkamala
Priority: Normal
E-Arogya - Feature #203: [LAB] Create UX design for ... Feature #203: [LAB] Create UX design for Sample Received status update in Lab department.

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #200: [LAB] Create UX for Laborat... Feature #200: [LAB] Create UX for Laboratory worklist screen

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #198: [LAB] Create UI sticker pri... Feature #198: [LAB] Create UI sticker print screen for Accession number (sample number)

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
E-Arogya - Feature #197: [LAB] Create Ux for Accessi... Feature #197: [LAB] Create Ux for Accession number (sample number) print

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #196: [LAB] Create services for A... Feature #196: [LAB] Create services for Accession number (sample number) generation

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
E-Arogya - Feature #193: [LAB] Create UX for Sample ... Feature #193: [LAB] Create UX for Sample collection screen

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #190: [LAB] Create UX design for ... Feature #190: [LAB] Create UX design for Phlebotomy Worklist screen

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #188: [LAB] Dashboard Page UI Scr... Feature #188: [LAB] Dashboard Page UI Screen design

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
E-Arogya - Feature #185: [User Mgmt] Create Employee... Feature #185: [User Mgmt] Create Employee master feature UI screen Design

Project: E-Arogya
Status: Resolved
Start date: 30/04/2024
Due date: 02/05/2024
Assignee: Raju Kuthadi
Priority: Normal
E-Arogya - Feature #183: [User Mgmt] Create UI Scree... Feature #183: [User Mgmt] Create UI Screen design for Role configuration feature.

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Uma Maheswarachari Melpati
Priority: Normal
E-Arogya - Feature #182: [User Mgmt] Create Design f... Feature #182: [User Mgmt] Create Design for Role change in Login profile.

Project: E-Arogya
Status: Resolved
Start date: 30/04/2024
Due date:
Assignee: Karthik Daram
Priority: Normal
E-Arogya - Feature #181: [User Mgmt] Create UI Desig... Feature #181: [User Mgmt] Create UI Design for Block / Unblock user

Project: E-Arogya
Status: Resolved
Start date: 30/04/2024
Due date:
Assignee: Karthik Daram
Priority: Normal
Rwanda RAMS - Task #180: [Service] - Create Import t... Task #180: [Service] - Create Import to Overlap table

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 30/04/2024
Due date:
Assignee: Santosh Mutakoduru
Priority: Normal
Rwanda RAMS - Task #179: [Service] - Create Import t... Task #179: [Service] - Create Import to Impassable table

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 30/04/2024
Due date:
Assignee: Santosh Mutakoduru
Priority: Normal
Karnataka Project Info Management System - Feature #178: GIS Layers for BWH ,TDIS Feature #178: GIS Layers for BWH ,TDIS

Project: Karnataka Project Info Management System
Status: Ready for Prod
Start date: 30/04/2024
Due date:
Assignee: Sindhuja Kadari
Priority: Normal
Karnataka Project Info Management System - Feature #177: Data verification for TDIS... Feature #177: Data verification for TDIS,BWH

Project: Karnataka Project Info Management System
Status: Ready for Prod
Start date: 30/04/2024
Due date:
Assignee: Madhuri Pinky Mendu
Priority: Normal
Karnataka Project Info Management System - Feature #176: Importing master tabls Feature #176: Importing master tabls

Project: Karnataka Project Info Management System
Status: Ready for Prod
Start date: 30/04/2024
Due date:
Assignee: Venkata Suryateja Thripuraribhotla
Priority: Normal
Karnataka Project Info Management System - Feature #175: Module Creation TDIS,BWH Feature #175: Module Creation TDIS,BWH

Project: Karnataka Project Info Management System
Status: Ready for Prod
Start date: 30/04/2024
Due date:
Assignee: Venkata Suryateja Thripuraribhotla
Priority: Normal
Karnataka Project Info Management System - Feature #174: [BlWH,RWH] Data verificatio... Feature #174: [BlWH,RWH] Data verification and data Import

Project: Karnataka Project Info Management System
Status: Ready for Prod
Start date: 30/04/2024
Due date:
Assignee: Madhuri Pinky Mendu
Priority: High
Karnataka Project Info Management System - Feature #173: [GIS] Publishing GIS layers Feature #173: [GIS] Publishing GIS layers

Project: Karnataka Project Info Management System
Status: Ready for Prod
Start date: 30/04/2024
Due date:
Assignee: Sindhuja Kadari
Priority: High
E-Arogya - Feature #166: [User Mgmt] Create UI Scree... Feature #166: [User Mgmt] Create UI Screen for Block / Unblock user

Project: E-Arogya
Status: Resolved
Start date: 30/04/2024
Due date:
Assignee: Karthik Daram
Priority: Normal
E-Arogya - Feature #163: [User Mgmt] Create screen f... Feature #163: [User Mgmt] Create screen for Role change in Login profile.

Project: E-Arogya
Status: New
Start date: 30/04/2024
Due date:
Assignee: Karthik Daram
Priority: Normal
E-Arogya - Feature #161: [User Mgmt] Create UI Scree... Feature #161: [User Mgmt] Create UI Screen for Role configuration feature.

Project: E-Arogya
Status: Resolved
Start date: 30/04/2024
Due date:
Assignee: Uma Maheswarachari Melpati
Priority: Normal
E-Arogya - Feature #147: [User Mgmt] Create Employee... Feature #147: [User Mgmt] Create Employee master feature UI screen.

Project: E-Arogya
Status: Resolved
Start date: 30/04/2024
Due date: 02/05/2024
Assignee: Raju Kuthadi
Priority: Normal
Rwanda RAMS - Feature #135: Impassable Feature #135: Impassable

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 30/04/2024
Due date:
Assignee: Praveen kumar Bandi
Priority: Normal
HIMS ERP 1.0 - Feature #114: [UI] 1 Buttons, Radio, Tabl... Feature #114: [UI] 1 Buttons, Radio, Tables, Input controls, Select Controls like web kit

Project: HIMS ERP 1.0
Status: Resolved
Start date: 30/04/2024
Due date: 03/05/2024
Assignee: Surender Billa
Priority: Normal

1

E-Arogya - Feature #324: [LAB] Create UX design for ... Feature #324: [LAB] Create UX design for Lab Equipment master

Project: E-Arogya
Status: New
Start date: 01/05/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #321: [LAB] Create UX design for ... Feature #321: [LAB] Create UX design for Lab specialty-Technician mapping

Project: E-Arogya
Status: New
Start date: 01/05/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #318: [LAB] Create UX Design for ... Feature #318: [LAB] Create UX Design for Lab Specialty-Lab doctor mapping.

Project: E-Arogya
Status: New
Start date: 01/05/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #315: [LAB] Create UX design for ... Feature #315: [LAB] Create UX design for Organism-Antibiotic mapping master

Project: E-Arogya
Status: New
Start date: 01/05/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #314: [LAB] Create services for A... Feature #314: [LAB] Create services for Antibiotic master

Project: E-Arogya
Status: New
Start date: 01/05/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
E-Arogya - Feature #312: [LAB] Create UX design for ... Feature #312: [LAB] Create UX design for Antibiotic master

Project: E-Arogya
Status: New
Start date: 01/05/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #309: [LAB] Create UX design for ... Feature #309: [LAB] Create UX design for Organism master

Project: E-Arogya
Status: New
Start date: 01/05/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #306: [LAB] Create UX Design for ... Feature #306: [LAB] Create UX Design for Test method master.

Project: E-Arogya
Status: New
Start date: 01/05/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #305: [LAB] Create UX Design for ... Feature #305: [LAB] Create UX Design for Container Type master screen.

Project: E-Arogya
Status: New
Start date: 01/05/2024
Due date:
Assignee: Tejeswar Veerabathni
Priority: Normal
E-Arogya - Feature #300: [LAB] Create UX design for ... Feature #300: [LAB] Create UX design for Sample Type master

Project: E-Arogya
Status: New
Start date: 01/05/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
E-Arogya - Feature #297: [LAB] Create UX for Lab Tes... Feature #297: [LAB] Create UX for Lab Test groups - Tests mapping

Project: E-Arogya
Status: New
Start date: 01/05/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
E-Arogya - Feature #296: [LAB] Create service for Ma... Feature #296: [LAB] Create service for Master screen Lab-Test parameters mapping.

Project: E-Arogya
Status: Resolved
Start date: 01/05/2024
Due date:
Assignee: Harish Beechani
Priority: Normal
E-Arogya - Feature #294: [LAB] Create UX for master ... Feature #294: [LAB] Create UX for master screen "Assign Test-Parameters

Project: E-Arogya
Status: New
Start date: 01/05/2024
Due date:
Assignee: Srusvin Loka
Priority: Normal
E-Arogya - Feature #286: [Security Audit Round 2 ] P... Feature #286: [Security Audit Round 2 ] Port misconfiguration (Repeated)

Project: E-Arogya
Status: Ready for Prod
Start date: 01/05/2024
Due date:
Assignee: Uday Kumar Dara
Priority: High
E-Arogya - Feature #282: [Security Audit Round 2 ] T... Feature #282: [Security Audit Round 2 ] Technology/Version Disclosure

Project: E-Arogya
Status: Ready for Prod
Start date: 01/05/2024
Due date:
Assignee: Uday Kumar Dara
Priority: High
E-Arogya - Feature #278: [Security Audit Round 2 ] ... Feature #278: [Security Audit Round 2 ] Sensitive Data Passed Through URL Parameters (Repeated)

Project: E-Arogya
Status: Ready for Prod
Start date: 01/05/2024
Due date:
Assignee: Pavan kumar Siddamsetti
Priority: High
E-Arogya - Feature #272: [Security Audit Round 2 ] I... Feature #272: [Security Audit Round 2 ] Improper Error Handling

Project: E-Arogya
Status: Ready for Prod
Start date: 01/05/2024
Due date:
Assignee: Uday Kumar Dara
Priority: High
E-Arogya - Feature #268: [Security Audit Round 2 ] C... Feature #268: [Security Audit Round 2 ] Cross Origin Resource Sharing (CORS) Misconfiguration

Project: E-Arogya
Status: Ready for Prod
Start date: 01/05/2024
Due date:
Assignee: Vasu Malladi
Priority: High
E-Arogya - Feature #267: [Security Audit Round 2 ] D... Feature #267: [Security Audit Round 2 ] Default pages disclosed

Project: E-Arogya
Status: Ready for Prod
Start date: 01/05/2024
Due date:
Assignee: Uday Kumar Dara
Priority: High
E-Arogya - Feature #265: [Security Audit Round 2 ] H... Feature #265: [Security Audit Round 2 ] Host Header Injection

Project: E-Arogya
Status: Resolved
Start date: 01/05/2024
Due date:
Assignee:
Priority: High
E-Arogya - Feature #263: [Security Audit Round 2 ] C... Feature #263: [Security Audit Round 2 ] Client side bypass / Improper server side validation

Project: E-Arogya
Status: Ready for Prod
Start date: 01/05/2024
Due date:
Assignee:
Priority: High
E-Arogya - Feature #261: [Security Audit Round 2 ] ... Feature #261: [Security Audit Round 2 ] Application Logic Bypass (Reapeated)

Project: E-Arogya
Status: Ready for Prod
Start date: 01/05/2024
Due date:
Assignee: Harish Beechani
Priority: High
E-Arogya - Feature #258: [Security Audit Round 2 ] ... Feature #258: [Security Audit Round 2 ] Weak Password Policy (Repeated)

Project: E-Arogya
Status: Ready for Prod
Start date: 01/05/2024
Due date:
Assignee: Harish Beechani
Priority: High
E-Arogya - Feature #256: [Security Audit Round 2 ] ... Feature #256: [Security Audit Round 2 ] Improper Session Management / Session Expiration too longer (Repeated)

Project: E-Arogya
Status: Ready for Prod
Start date: 01/05/2024
Due date:
Assignee: Harish Beechani
Priority: High
E-Arogya - Feature #250: [Security Audit Round 2 ] S... Feature #250: [Security Audit Round 2 ] Sensitive Information Disclosure (Repeated)

Project: E-Arogya
Status: Resolved
Start date: 01/05/2024
Due date:
Assignee: Vasu Malladi
Priority: High
E-Arogya - Feature #248: [Security Audit Round 2 ] ... Feature #248: [Security Audit Round 2 ] Framework Obsolete Version in usage (Repeated)

Project: E-Arogya
Status: Resolved
Start date: 01/05/2024
Due date:
Assignee: Vasu Malladi
Priority: High
E-Arogya - Feature #245: [Security Audit Round 2 ] ... Feature #245: [Security Audit Round 2 ] Insecure Data Storage (Reopened)

Project: E-Arogya
Status: Resolved
Start date: 01/05/2024
Due date: 02/05/2024
Assignee: Raju Kuthadi
Priority: High
E-Arogya - Feature #235: [Security Audit Round 2 ] Feature #235: [Security Audit Round 2 ]

Project: E-Arogya
Status: New
Start date: 01/05/2024
Due date: 08/05/2024
Assignee:
Priority: High

2

E-Arogya - Feature #245: [Security Audit Round 2 ] ... Feature #245: [Security Audit Round 2 ] Insecure Data Storage (Reopened)

Project: E-Arogya
Status: Resolved
Start date: 01/05/2024
Due date: 02/05/2024
Assignee: Raju Kuthadi
Priority: High
E-Arogya - Feature #185: [User Mgmt] Create Employee... Feature #185: [User Mgmt] Create Employee master feature UI screen Design

Project: E-Arogya
Status: Resolved
Start date: 30/04/2024
Due date: 02/05/2024
Assignee: Raju Kuthadi
Priority: Normal
E-Arogya - Feature #147: [User Mgmt] Create Employee... Feature #147: [User Mgmt] Create Employee master feature UI screen.

Project: E-Arogya
Status: Resolved
Start date: 30/04/2024
Due date: 02/05/2024
Assignee: Raju Kuthadi
Priority: Normal
E-Arogya - Feature #144: [User Mgmt] Create a module... Feature #144: [User Mgmt] Create a module for user Management.

Project: E-Arogya
Status: New
Start date: 29/04/2024
Due date: 02/05/2024
Assignee: Harish Beechani
Priority: Normal
RRAMS Citizens - Mobile Application - Bug #142: Code optimization Bug #142: Code optimization

Project: RRAMS Citizens - Mobile Application
Status: Resolved
Start date: 29/04/2024
Due date: 02/05/2024
Assignee: Prashanth Appani
Priority: Immediate
Rwanda RAMS - Bug #355: All modules Link code not b... Bug #355: All modules Link code not binding in edit page

Project: Rwanda RAMS
Status: Ready for Prod
Start date: 02/05/2024
Due date:
Assignee: Vengaiah Patcha
Priority: Normal
Digital Social Survey - Mobile Application - HOLD - Feature #351: Changes On DB Feature #351: Changes On DB

Project: Digital Social Survey - Mobile Application - HOLD
Status: Ready for Prod
Start date: 02/05/2024
Due date:
Assignee: Venkata Suryateja Thripuraribhotla
Priority: High
Digital Social Survey - Mobile Application - HOLD - Feature #350: Create Columns In DB Feature #350: Create Columns In DB

Project: Digital Social Survey - Mobile Application - HOLD
Status: Ready for Prod
Start date: 02/05/2024
Due date:
Assignee: Venkata Suryateja Thripuraribhotla
Priority: High
E-Arogya - Feature #347: [Security Audit Round 2 ] ... Feature #347: [Security Audit Round 2 ] Stopping future dates in entire application

Project: E-Arogya
Status: Resolved
Start date: 02/05/2024
Due date:
Assignee: Karthik Daram
Priority: Normal
Digital Social Survey - Mobile Application - HOLD - Feature #346: Project name on UI Feature #346: Project name on UI

Project: Digital Social Survey - Mobile Application - HOLD
Status: New
Start date: 02/05/2024
Due date:
Assignee:
Priority: Normal
Digital Social Survey - Mobile Application - HOLD - Feature #345: Feature on DSS - (latest ed... Feature #345: Feature on DSS - (latest edited filed)

Project: Digital Social Survey - Mobile Application - HOLD
Status: New
Start date: 02/05/2024
Due date:
Assignee:
Priority: Normal
Digital Social Survey - Mobile Application - HOLD - Feature #344: Validation in Id proof Feature #344: Validation in Id proof

Project: Digital Social Survey - Mobile Application - HOLD
Status: New
Start date: 02/05/2024
Due date: 07/05/2024
Assignee:
Priority: Normal
Digital Social Survey - Mobile Application - HOLD - Feature #342: Structure Number in Section A Feature #342: Structure Number in Section A

Project: Digital Social Survey - Mobile Application - HOLD
Status: Ready for Prod
Start date: 02/05/2024
Due date:
Assignee: Venkata Suryateja Thripuraribhotla
Priority: Normal
RRAMS Citizens - Mobile Application - Bug #335: OTP ISSUE Bug #335: OTP ISSUE

Project: RRAMS Citizens - Mobile Application
Status: In Progress
Start date: 02/05/2024
Due date:
Assignee: Bhanuchander Sannidhanam
Priority: High
RRAMS PWD - Mobile Application - Bug #333: Expired Token Bug #333: Expired Token

Project: RRAMS PWD - Mobile Application
Status: Resolved
Start date: 02/05/2024
Due date:
Assignee: Kalyan Battula
Priority: Normal
RRAMS PWD - Mobile Application - Bug #330: Pie Chart Bug #330: Pie Chart

Project: RRAMS PWD - Mobile Application
Status: Resolved
Start date: 02/05/2024
Due date:
Assignee: Prashanth Appani
Priority: Urgent

3

HIMS ERP 1.0 - Bug #169: [UI] Theming on Buttons, R... Bug #169: [UI] Theming on Buttons, Radio, Tables, Input controls, tabs, Select Controls like web kit

Project: HIMS ERP 1.0
Status: Resolved
Start date: 29/04/2024
Due date: 03/05/2024
Assignee: Praveen Madeti
Priority: Normal
HIMS ERP 1.0 - Feature #114: [UI] 1 Buttons, Radio, Tabl... Feature #114: [UI] 1 Buttons, Radio, Tables, Input controls, Select Controls like web kit

Project: HIMS ERP 1.0
Status: Resolved
Start date: 30/04/2024
Due date: 03/05/2024
Assignee: Surender Billa
Priority: Normal
E-Arogya - E-Arogya - Sprint 1 (29th April - 3rd May) HIMS ERP 1.0 - HIMS ERP 1.0 - Sprint 1 (29th April - 3rd May)
E-Arogya - Feature #360: [User Mgmt] Create UI scree... Feature #360: [User Mgmt] Create UI screen for Role Master

Project: E-Arogya
Status: Resolved
Start date: 03/05/2024
Due date:
Assignee: Uma Maheswarachari Melpati
Priority: Normal
RRAMS PWD - Mobile Application - Bug #358: Not acceptable response. Bug #358: Not acceptable response.

Project: RRAMS PWD - Mobile Application
Status: Resolved
Start date: 03/05/2024
Due date:
Assignee: Bhanuchander Sannidhanam
Priority: High
E-Arogya - Feature #184: [User Mgmt] Create UI scree... Feature #184: [User Mgmt] Create UI screen design for User Group

Project: E-Arogya
Status: Resolved
Start date: 03/05/2024
Due date:
Assignee: Kranti Boddu
Priority: Normal
E-Arogya - Feature #158: [User Mgmt] Create screen f... Feature #158: [User Mgmt] Create screen for Role Master

Project: E-Arogya
Status: In Progress
Start date: 03/05/2024
Due date:
Assignee: Uma Maheswarachari Melpati
Priority: Normal
E-Arogya - Feature #154: [User Mgmt] Create UI scree... Feature #154: [User Mgmt] Create UI screen for UserGroup

Project: E-Arogya
Status: Resolved
Start date: 03/05/2024
Due date:
Assignee: Kranti Boddu
Priority: Normal

4