Project

General

Profile

Actions

Bug #389

closed

Social survey observations on new build given 9 may 2024

Added by Kalyan Battula 11 months ago. Updated 11 months ago.

Status:
Closed
Priority:
Normal
Start date:
20/05/2024
Due date:
% Done:

100%

Estimated time:
(Total: 0:00 h)
Deployed In:
Category:

Description

1. Implement search feature in all dropdowns(all lookup data).
2. Is there any variation in the Centerline of PROW v/s EROW at this chain age? Yes/No
• If yes, shift towards which side
RHS /LHS (dropdown)
• Shift in meters --------
Details:
1 Label name - Variation in Center Line - toggle button (Yes/No) - info(Is there any variation in the Centerline of PROW v/s EROW at this chain age?) button.
2 if yes, Label name - Side - dropdown (RHS/LHS).
3 if yes, Label name - Shift(In meters) - entry textbox.
4 save all these into local and server.
3. Center point(in Meters) - entry textbox.
4. Agency - entry textbox.
5. Supervisor's name - entry textbox.
6. In the year of establishment section and B.1.1, point, how old the structure should have cross reference with the year of construction? Accordingly, validations should be done.

PFA of observations


Files

SocialSurvey_Obs_14may2024.docx (741 KB) SocialSurvey_Obs_14may2024.docx Kalyan Battula, 14/05/2024 11:56 AM
Social survey_20 observations_10-05-24.docx (4.64 MB) Social survey_20 observations_10-05-24.docx prathyusha Ramisetti, 15/05/2024 11:39 AM
ss-1.jpg (271 KB) ss-1.jpg Owner details -> Occupied by column-> if we select Tenant option in dropdown separate screen should appear for entering the required details. prathyusha Ramisetti, 20/05/2024 05:04 PM

Subtasks 3 (0 open3 closed)

Bug #445: Improper UI -" Occupied by" in Section -AClosedprathyusha Ramisetti20/05/2024

Actions
Bug #447: Edit Screen - Issue while deleting uploaded image.ClosedKalyan Derangula 20/05/2024

Actions
Bug #448: Error while updating the saved data in Edit ScreenClosedKalyan Derangula 20/05/2024

Actions
Actions #1

Updated by Jyoshna Behara 11 months ago

  • Due date set to 15/05/2024
  • Status changed from New to In Progress
  • Assignee changed from Subodh Neelapati to Kalyan Derangula

check attached documents and fix the error

Actions #3

Updated by Kalyan Derangula 11 months ago

  • Status changed from In Progress to Ready for Prod

Issues fixed

Actions #4

Updated by prathyusha Ramisetti 11 months ago

Actions #5

Updated by prathyusha Ramisetti 11 months ago

  • Subtask #445 added
Actions #6

Updated by prathyusha Ramisetti 11 months ago

  • Subtask #448 added
Actions #7

Updated by prathyusha Ramisetti 11 months ago

  • Status changed from Ready for Prod to Closed
Actions

Also available in: Atom PDF